A renovation can be an excellent way to modernize your home. Smaller whole-house remodels, on average, will take 7 to 10 months to complete from discovery to completion, assuming all goes well. Larger whole-house remodels typically take 9 to 15 months, with additional time required if there are issues with city permits or other unforeseen delays.

House renovation from top to bottom

If you intend to renovate your home from top to bottom, be prepared for a lengthy and laborious process. Depending on the size and scope of your project, completion could take months or even years.

If you’re planning a major renovation, it’s best to consult with a professional contractor who can give you a time estimate. They will be able to account for all of the various elements that must be considered, such as permits, inspections, and material ordering.

Even if you’re not doing a total gut renovation, there’s a lot that needs to be done to make your house look its best. If you’re painting, installing new floors, or doing any other type of construction work, you’ll need to budget time for these tasks as well.

When will the project be finished?

The average home renovation takes between four and six months to complete, depending on the size and scope of the project. Smaller projects may only take a few weeks, whereas larger ones may take a year or more.

The severity of the damage, the amount of work required, the availability of materials and labor, and the weather will all influence the timeline for your project. Most home renovations, however, will follow a similar timetable:

1. Design and planning: This is the first step in any renovation project, and it is critical to take your time with it. You’ll need to decide what you want to accomplish with the renovation, how much it will cost, and how much time you have. This stage can last several weeks to several months.

2. Demolition: Once your plans have been finalized, it’s time to start tearing things down. This stage can be messy and chaotic, but it’s also when you’ll start to see real progress. Deconstruction can take anywhere from a few days to several weeks, depending on the size of your project.

3. Construction: This is where the real work begins. Your contractor will begin erecting walls, installing fixtures and appliances, and otherwise transforming your space. Depending on the size and complexity of the renovation, this stage may take several weeks or even months to complete.